Replacing your gas furnace, oil heater, aging air conditioner, baseboards, etc. with a modern heat pump gives you efficient heating and cooling in one quiet system, with greater comfort than you've previously had and typically lower utility bills.
1. Consult your QuitCarbon Clean Energy Coach (ideally days to months in advance). The earlier you start exploring a heat pump upgrade, the more opportunity exists for QuitCarbon to find you the best rebates, the ideal systems, the right contractor and more. It is never too early to contact QuitCarbon!
3. Request a referral to a vetted heat pump contractor. QuitCarbon will connect you with the right contractor for your heat pump upgrade - request an intro on FIXME.
4. Contractor visit (usually within a week of your referral). A comfort advisor will typically take measurements of your home, look at your ducts and electrical panel, and talk through options. They may perform a preliminary load calculation .
5. Your proposal (same day to one week). You’ll receive a bid, often via email. Proposals typically cover:
Send your proposal to QuitCarbon for review. We'll check sizing, pricing, and equipment, and rebates - typically our review takes a few days.
6. Decide, sign your contract, and do pre-rebate work. Here's an important timing detail: some rebates must be reserved before installation begins. Ask your contractor which incentives they're applying for on your behalf, and confirm the reservation is submitted before the crew arrives. Notify QuitCarbon that you are proceeding.
7. The project manager visit (within 1–2 weeks of signing). Most contractors send a project manager, installer, or electrician back to finalize details. Use this visit to confirm:
Occasionally this visit reveals something that changes the design or price, so expect an updated estimate if it does.
8. Scheduling (days to a few weeks). Heat pump installs are usually scheduled quickly, often within one to three weeks of signing, and sometimes sooner if a slot opens up. Heat waves, cold snaps, and busy seasons can push dates out.
9. Installation day(s) (2-6 days). Your heat will be off while the old furnace is removed, so plan accordingly in cold weather. The crew will need access to your attic or crawlspace, electrical panel, and the outdoor unit location. They'll typically:
Before the crew leaves, do a walkthrough. Test both heating and cooling, even if it's a hot day and you won't need heat for months. Make sure your thermostat is set up, and ask how to change the filter.
Check out: I got a heat pump! Now what?
10. Testing and final inspection (2 weeks to 3 months). In California, replacing a furnace, AC, or heat pump typically requires a mechanical permit plus independent field verification of duct leakage, refrigerant charge, and airflow before the job can pass final inspection. That verification is done by a third-party rater, formerly called a HERS rater and now an ECC verifier. Your city inspector then signs off.
In other states, inspections and permit signoff may be required. Inspection wait times vary widely by jurisdiction - sometimes it can happen within days, other times it can take months. It's not unusual for an inspection to flag corrections, which your contractor handles before a re-inspection. Your system can run normally in the meantime.
11. Getting used to your heat pump (first few weeks to months). Heat pumps work differently from your previous heating system. Check out our guidance: I got a heat pump! Now what?
12. Rebates and paperwork (weeks to months). Ensure you add your paid, itemized invoice, your final permit, and photos of your old equipment to your QuitCarbon Home Profile. Contractor-filed rebates are submitted for you, while others you'll file yourself - your QuitCarbon Insights tell you which is which. If you qualify, claim your QuitCarbon Rebate once your project is complete.
| Stage | Typical time | What may make it take longer |
|---|---|---|
| Site visit | Within 1-2 weeks | Scheduling |
| Proposal | Same day – 1 week | Separate bids from subcontractors |
| Decision and signing | Days – weeks | Rebate questions, comparing options |
| Pre-installation Project Manager visit (this occurs only sometimes) | 1–2 weeks after signing | Design changes, scheduling |
| Installation | 2-6 days | Weather, complex ductwork |
| Inspection and permit sign-off | 2 weeks – 3 months | City backlog, corrections |
| Rebate processing | Weeks – months | Program backlogs, paperwork corrections |
Most of our clients tell us the first winter with a heat pump is a revelation: quieter, steadier, and more comfortable than their old heating system, with air conditioning as a bonus. We can't wait to help you experience the magic of a heat pump!